Good day to all.
I apologize in advance for my bad english.
I have learned this SYSVOL Replication Migration Guide: FRS to DFS Replication and blog SYSVOL Migration Series. Then I successfully completed the migration FRS->DFSR, but I still have 2 questions:
1. There is a step "force AD replication" (repadmin /syncall /A /e /d), for example in article about migration to the "prepared" global state. But why this step is at the "Monitoring" stage? I mean there is point to force replication immediately after setting the global state to accelerate the reception of migration directive by domain controllers. But why force replication when the migration to the specified state is done? The same question about dfsrdiag /pollAD.
2. There is information, that SYSVOL_DFSR will contain only "domain" and "sysvol" folders and it is true. Should I manually create "staging" and "staging areas" with junction point inside or not? I do not really know what these folders are needed for.
Thanks.