Hi,
I have Win 2012 Hyper-V installed and connected to the 2 switches as attached diagram.
The 2 switches are cisco and portfast is enable to all ports.
Is the diagram a good method or I have done wrongly?
Is there the better way than my diagram.
Thanks.
Chan